homeproject launchesmedia centrecompany informationinvestor relationsregistrationcareersguides & tools
project launches
current projects
 
mutiara puchong phase 3 logo
the lifestyle
pleasant amenities
floor plans
the finishes
site plan
location
showhouse
sales gallery
promotion/ event
the finisheslakeside terrace mutiara puchong
   
 
   
Structure : Reinforced Concrete Frame
     
Bricks : Clay / Cement Sand Bricks
     
Roofing : Concrete Roof Tiles
     
Roof : Metal Roof Truss
     
Ceiling    
Living, Dining & Bedroom 4 : Skim Coat
Master Bedroom, Bedroom 2 & 3, Family Area : Asbestos Free Ceiling Board
Car Porch, Terrace : Asbestos Free Ceiling Board
All Baths : Asbestos Free Ceiling Board
Others : Skim Coat / Cement Plaster
     
Windows : Casement Windows & Fixed Panels
     
Door    
Main Entrance :

Aluminium Sliding Door & Decorative Solid Timber Door

Dining : Aluminium Sliding Door (Corner & Extended Corner Unit)
Aluminium Swing Door (End Corner Unit)
Bedrooms & Kitchen : Plywood Flushed Door
Baths : Plywood Flushed Door
     
Locks : Quality Lockset
     
Flooring    
Living, Dining & Bedroom 4 : Ceramic Tiles
Kitchen : Ceramic Tiles
Master Bedroom, Bedroom 2 & 3, Family Area : Ceramic Tiles
Baths : Ceramic Tiles
Terrace : Ceramic Tiles
Balcony (Corner Unit) : Ceramic Tiles
Car Porch : Ceramic Tiles
Driveway : Cement Render
Others : Cement Render
     
Wall Tiles / Decorative    
Kitchen : Average 1500mm High Ceramic Tiles
Baths : Ceramic Tiles To Ceiling Heights
Others : Plaster & Paint
     
Sanitary Installation    
Pedestal W.C. : 3 Nos.
Vanity Top Basin : 1 No.
Wash Basin : 2 Nos.
Shower Rose : 3 Nos.
Soap Holder : 3 Nos.
Toilet Roll Holder : 3 Nos.
Kitchen Sink : 1 No.
Garden Tap : 1 No.
Tap : 1 No.
     
Electrical Installation  
Corner/Extended Corner/End Corner Lot

End Lot Intermediate Lot
Lighting Point :
20 18 18
13 amp Power Point :
21 21 21
Ceiling Fan Point :
2 2 2
Gate Lighting Point :
1 1 1
Auto Gate Point :
1 1 1
Door Bell Point :
1 1 1
Air-Cond Point :
1 1 1
TV Point :
2 2 2
Telephone Point :
2 2 2
Water Heater Point :
2 2 2
     
Fencing : 1500mm High Bricks And M.S. Grilles to Front
1500mm High Chain Link Fencing for Rear
     
   
   
malton logo
new projects
current projects
future projects
completed projects
Stay Up-to-date
Please register with us for all our future launches.
register now
contact ussitemapterms of usageprivacy policycopyright (c) 2008 Malton Berhad Group. All Rights Reserved.