homeproject launchesmedia centrecompany informationinvestor relationsregistrationcareersguides & tools
project launches
current projects
 
mutiara indah phase 2a logo
mutiara indah township
the lifestyle
pleasant amenities
floor plans
the finishes
site plan
location
sales offices
the finishesquartet link semi-dee homes logo
   
 
   
Structure : Reinforced Concrete
     
Walls : Bricks with Cement Plaster
     
Roof : Concrete Roof Tiles
     
Ceiling : Skim Coat / Asbestos free Ceiling Board
     
Windows : Bronze Anodised Aluminium Casement Windows
  : Bronze Anodised Aluminium Top Hung Windows
  : Bronze Anodised Aluminium Fixed Glass Windows
  : Aluminium Frame Fixed Glass Louvres Windows
     
Doors    
Main Entrance : Decorative Timber Door
Dining : Bronze Anodised Aluminium Frame Sliding Door
Store Room : Timber Flush Door With Louvres
Others : Timber Flush Door
     
Lockset    
Entrance Door : Decorative Locksets
Sliding Door : Flush Hook Locksets
Others : Cylindrical Locksets
     
Floor Finishes    
Living, Dining & Bedroom 4 : Ceramic Tiles
Kitchen / Bathrooms : Ceramic Tiles
Staircase : Laminated Timber Strip
Master bedroom, Bedroom 2 & 3 : Laminated Timber Strip
Family area : Laminated Timber Strip
Terrace : Texture Concrete
Car porch & Driveway : Texture Concrete
Others : Cement Render
     
Wall Finishes    
Kitchen : 1500mm ht Ceramic Tiles
Bathrooms : Full Height Ceramic Tiles
     
Sanitary Installations   2-Storey
Pedestal W.C. : 3 Nos.
Wash Hand Basins with Vanity Top : 1 No.
Wash Hand Basins : 2 Nos.
Shower Rose : 3 Nos.
Long Bath : 1 No.
Soap Holder : 3 Nos.
Toilet Roll Holder : 3 Nos.
Basin Tap : 3 Nos.
Bib Tap : 3 Nos.
Single Bowl Single Drainer Stainless Steel Kitchen Sink : 1 No.
Kitchen Sink Tap : 1 No.
Garden / Drying Yard Hose Bib : 2 Nos.
     
Electrical Installations    
Lighting Point : 23 Nos.
Gate Light Point : 1 No.
13 Amp Power Point : 17 Nos.
Telephone Point : 2 Nos.
TV Point : 2 Nos.
Door Bell Point : 1 No.
Water Heater Point : 1 No.
Air-cond Point : 2 Nos.
     
Paints    
External Wall : Plaster with Weather Resistant Paint
Internal Wall : Plaster with Emulsion Paints
     
Fencing & Gate    
Front / Side / Rear : 1500mm ht with brick wall & MS Grille Fencing
Gate Post : Brickwork gate post c/w letter box and refuse chamber
     
Extra Features : Security Alarm System
  : Automatic Swing Gate
  : Motion Detector Light
  : Water Filtration System
     
   
   
malton logo
new projects
current projects
future projects
completed projects
Stay Up-to-date
Please register with us for all our future launches.
register now
contact ussitemapterms of usageprivacy policycopyright (c) 2008 Malton Berhad Group. All Rights Reserved.